Power BI Connector for Asana

Build 24.0.9060

AddProjectToTask

Add a project to a task.

Input

Name Type Required Description
TaskId String True The Tasks Id to operate on.
ProjectId String True The project Id to add the task.
SectionId String False A section Id in the project to insert the task into. The task will be inserted at the bottom of the section.
AddAfter String False A task Id in the project to insert the task after, or null to insert at the beginning of the list.
AddBefore String False A task Id in the project to insert the task before, or null to insert at the end of the list.

Result Set Columns

Name Type Description
Status String The status of the operation.

Copyright (c) 2024 CData Software, Inc. - All rights reserved.
Build 24.0.9060