ODBC Driver for Zoho Projects

Build 26.0.9770

TaskReorder

Reorders the tasks within a task list in the given project. Task will be reordered in-between two tasks based on the before and after task IDs.

Procedure-Specific Information

An example query for executing this stored procedure is shown below:
EXEC TaskReorder PortalId = '12345317133', ProjectId = '123456000000031899', TaskId = '123456000000034053', Before = '123456000000031932', After = '123456000000031941'

Input

Name Type Required Description
PortalId Long True Specify the portal ID.
ProjectId Long True Specify the project ID.
TaskId Long True Specify the Task ID.
Before Long False Specify the the ID of the task before which this task should be placed. Provide only one of before, after, or position..
After Long False Specify the the ID of the task after which this task should be placed. Provide only one of before, after, or position.
Position String False Specify the relative placement of the task within the task list. Ignored if before or after is specified.

The allowed values are first, last.

Result Set Columns

Name Type Description
Success String Specifies whether the update was successful.

Copyright (c) 2026 CData Software, Inc. - All rights reserved.
Build 26.0.9770