RequestToScheduleOperationResource
Schedules a work order operation resource manually for a specific timeline.
Input
| Name | Type | Description |
| PlanId | Integer | A unique identifier for the production schedule being modified. |
| RepairCommands | String | Specifies the changes to the operation resource schedule, indicating the transition from the current state to the desired state. |
Result Set Columns
| Name | Type | Description |
| Result | String | Indicates the result of the execution, specifying whether the operation resource was successfully scheduled. |