ProjectForecastsPlanningOptionsExportOptions
The Export Option resource is used to select the planning options attributes to export.
Columns
| Name | Type | Description |
| ProjectForecastsPlanVersionId [KEY] | Long | Identifier of the forecast version. |
| PlanningoptionsPlanningOptionId [KEY] | Long | Identifier of the summary level planning option in the project forecast version. |
| ExportOptionId [KEY] | Long | Identifier of the project forecast version export options. |
| DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag | Bool | Indicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies. |
| DisplayCommitmentsFlag | Bool | Indicates whether to display the external commitments present in the budget or forecast plan lines. |
| PlanningCurrency | String | Currency used for planning in the forecast line. This value is always set to true and the attribute is exported. |
| PlanningResource | String | Resource used for financial planning in the forecast line. This value is always set to true and the attribute is exported. |
| ResourceClass | String | Resource class associated with the forecast line. This value is always set to true and the attribute is exported. |
| SpreadCurve | String | Spread curve associated with the forecast line. This value is always set to true and the attribute is exported. |
| TaskName | String | Name assigned to a task. This value is always set to true and the attribute is exported. |
| TaskNumber | String | Number of the task. This value is always set to true and the attribute is exported. |
| BurdenedCostStandardMultiplier | String | Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostStandardRate | String | Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| StandardRawCostRate | String | Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionCostRate | String | Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionCostDate | String | Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionCostDateType | String | Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionCostRateType | String | The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionCostRate | String | Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionCostDate | String | Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionCostDateType | String | Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionCostRateType | String | The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionRevenueRate | String | Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionRevenueDate | String | Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionRevenueDateType | String | Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectCurrencyConversionRevenueRateType | String | The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionRevenueRate | String | Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionRevenueDate | String | Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionRevenueDateType | String | Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ProjectLedgerCurrencyConversionRevenueRateType | String | The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| StandardRevenueRate | String | Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EffectiveBurdenedCostRate | String | User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EffectiveRawCostRate | String | User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EffectiveRevenueRate | String | User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ToDate | String | End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostEffectiveMultiplier | String | Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| FromDate | String | From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| UnitOfMeasure | String | Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualBurdenedCostAmounts | String | Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualQuantity | String | Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRawCostAmounts | String | Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPOCommitmentsInPC | String | Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPRCommitmentsInPC | String | Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostInvoiceCommitmentsInPC | String | Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPOCommitmentsInPLC | String | Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPRInCommitmentsPLC | String | Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostInvoiceCommitmentsInPLC | String | Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPOCommitments | String | Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostPRCommitments | String | Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| BurdenedCostInvoiceCommitments | String | Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualBurdenedCostInPC | String | Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACBurdenedCostInPC | String | Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCBurdenedCostInPC | String | Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalBurdenedCostCommitmentsInPC | String | Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualBurdenedCostInPLC | String | Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACBurdenedCostInPLC | String | Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCBurdenedCostInPLC | String | Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalBurdenedCostCommitmentsInPLC | String | Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACBurdenedCost | String | Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACQuantity | String | Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRawCost | String | Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCBurdenedCost | String | Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCQuantity | String | Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRawCost | String | Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualMargin | String | Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACMargin | String | Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCMargin | String | Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualMarginInPC | String | Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACMarginInPC | String | Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCMarginInPC | String | Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACMarginPercentage | String | Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCMarginPercentage | String | Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualMarginInPLC | String | Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACMarginInPLC | String | Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCMarginInPLC | String | Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRevenueInPC | String | Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRevenueInPLC | String | Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| QuantityPOCommitments | String | Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| QuantityPRCommitments | String | Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| QuantityInvoiceCommitments | String | Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPOCommitmentsInPC | String | Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPRCommitmentsInPC | String | Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostInvoiceCommitmentsInPC | String | Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPOCommitmentsInPLC | String | Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPRCommitmentsInPLC | String | Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostInvoiceCommitmentsInPLC | String | Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPOCommitments | String | Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostPRCommitments | String | Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| RawCostInvoiceCommitments | String | Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRawCostInPC | String | Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRawCostInPC | String | Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRawCostInPC | String | Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalRawCostCommitmentsInPC | String | Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRawCostInPLC | String | Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRawCostInPLC | String | Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRawCostInPLC | String | Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalRawCostCommitmentsInPLC | String | Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ActualRevenueAmounts | String | Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRevenue | String | Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRevenue | String | Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRevenueInPC | String | Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRevenueInPC | String | Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| EACRevenueInPLC | String | Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| ETCRevenueInPLC | String | Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalBurdenedCostCommitments | String | Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalQuantityCommitments | String | Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| TotalRawCostCommitments | String | Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. |
| FinancialPlanType | String | financialplantype |
| Finder | String | finder |
| PlanVersionId | Long | planversionid |
| ProjectId | String | projectid |