Power BI Connector for Oracle Fusion Cloud Financials

Build 25.0.9454

WorkConfirmationslines

Details line-level entries for a work confirmation, tracking the portions of work completed or amounts to be billed.

Columns

Name Type Description
WorkConfirmationsWorkConfirmationId [KEY] Long The unique identifier of the work confirmation. This ID links each line item to its respective work confirmation document.
WorkConfirmationLineId [KEY] Long The unique identifier of the specific work confirmation line. This ID allows for tracking and managing individual line items within the work confirmation.
WorkConfirmationId Long The unique identifier of the work confirmation document to which this line belongs. This establishes the relationship between the work confirmation and its associated lines.
POLineLocationId Long The unique identifier for the purchase order schedule related to this work confirmation line. It links the line to a specific location within the purchase order.
Amount Decimal The amount of work completed for this line on a progress payment schedule. It reflects the value of work done for the period or performance milestone.
Quantity Decimal The quantity of work completed for the line within the progress payment schedule. This helps to track the physical units of work completed.
TotalProgressPercent Decimal The percentage of work completed for the line as part of the overall progress payment schedule. This percentage is used for tracking completion levels.
POLineId Long The unique identifier of the purchase order line to which this work confirmation line corresponds. It links the confirmation line back to the purchase order.
POScheduleNumber Decimal The number assigned to the purchase order schedule for this line. It helps to identify the specific schedule in which the work confirmation applies.
WorkConfirmationNumber String The number of the work confirmation associated with this line. It is used to identify and reference the specific work confirmation document.
POLineNumber Decimal The number of the purchase order line that corresponds to this work confirmation line. This number is used to differentiate between multiple lines within the same purchase order.
CreationDate Datetime The date and time when the work confirmation line was created. This timestamp helps track when the line item was first logged in the system.
CreatedBy String The user who created the work confirmation line record. This helps identify the individual responsible for entering the line item into the system.
LastUpdateDate Datetime The date and time when the work confirmation line was last updated. It is important for tracking modifications and ensuring data is current.
LastUpdatedBy String The user who last updated the work confirmation line record. This helps in identifying the individual who made the most recent changes.
POScheduleDescription String A description of the purchase order schedule that this work confirmation line is tied to. This provides context about the schedule and its details.
UOMCode String The unit of measure code used for this work confirmation line. It is a shorthand notation for the unit in which the work or quantity is measured.
UOM String The full description of the unit of measure for the work confirmation line. It provides more detailed information about how the work is quantified (for example, 'Hours', 'Units').
ScheduleTypeCode String The code that identifies the type of schedule for this work confirmation line. This helps classify the schedule (for example, 'Fixed', 'Variable').
ScheduleType String The description of the schedule type for the work confirmation line. This provides further context about how the schedule is structured.
PreviouslyApprovedAmount Decimal The amount of work that was previously approved on this line. This helps to track the total approved amount for progress payments.
ProjectedRetainageThisPeriod Decimal The amount of retainage projected for this period. Retainage is the portion of the payment withheld until the work is completed or accepted.
ScheduledValue Decimal The scheduled value for this work confirmation line, which reflects the agreed-upon value for the work to be completed during the period.
TotalProjectedRetainageToDate Decimal The cumulative retainage amount projected to date. It includes all retainage amounts withheld across all periods up to the current date.
TotalCompleted Decimal The total amount of work completed for this line to date. This reflects the overall completion progress for the work item.
BalanceToFinish Decimal The balance of work yet to be completed for the line. This helps to track the remaining work for the project.
Price Decimal The price of the work item as it appears in the work confirmation line. This value is used for financial tracking and calculations of total cost.
MaximumRetainageAmount Decimal The maximum allowable retainage amount for this work confirmation line. It helps ensure that the retainage does not exceed contractual limits.
RetainageRate Decimal The percentage of retainage to be withheld for this work confirmation line. It is used to calculate the total amount of retainage for the work performed.
ScheduledQuantity Decimal The quantity of work that is scheduled to be completed for this line. This is used for tracking planned work versus actual work completed.
Finder String A general-purpose field for searching and filtering records in the system. It helps identify specific work confirmation lines based on user-defined criteria.
Intent String The purpose or intent behind creating or updating the work confirmation line. It provides context for the action being taken.
SysEffectiveDate String The effective date parameter used in system queries to filter resources based on their effective date range. This ensures the system retrieves the correct data for the specified period.
EffectiveDate Date The date used to fetch resources that are effective as of the specified start date. It ensures that actions are considered within their effective time range.

Copyright (c) 2025 CData Software, Inc. - All rights reserved.
Build 25.0.9454