plannedStandardCostComponents
Breaks down planned standard costs into individual components, providing detailed cost analysis for budgeting.
Columns
| Name | Type | References | Description |
| componentitem | String | The component item associated with the record, typically representing a part or material used in the assembly or production process. | |
| conversionrate | Double | The rate used to convert one unit of measure (UOM) to another, such as converting kilograms to pounds or liters to gallons. | |
| cost | Decimal | The cost associated with the item or component, representing the monetary value incurred for procurement or manufacturing. | |
| costcategory | String | The category to which the cost belongs (such as labor, materials, or overhead), used for classifying and tracking expenses. | |
| plannedstandardcost | String | The planned or expected cost for the item or component, typically used in budgeting and cost management processes. |